Есть ответ 👍

Выберите слова или сочетания слов для заполнения пропусков так, чтобы они отражали особенности написания и оформления делового письма: contract proposal for services, dear mr black, we hereby (1) furnish all materials and perform all labor necessary for the (2) davit installation of the following specifications: one no. 1000 lb. galvanized davit installed on seawall four-way lifting bridle three 2"x8" wood fenders anchored to the wall with 5' rubber bumper strip on each. this work is to be performed on lot. blk. sub. for (name of owner), owner, in accordance with the drawings and specifications submitted for the above work. the total cost including state tax is (amount) payments to be made as follows : the sum of (amount) to be paid upon the (3) of this contract and the balance of (amount) upon the completion of the work. any alteration or deviation from the above specifications involving extra cost of material or labor will only be executed upon written orders for same and will become an (4) over the sum mentioned in this contract. all agreements must be made (5) property lines shall be designated by substantial marks, by owner or his certified engineer. the contractors shall not be (6) as regards to the completion of the work, for any delay which may be caused by reason or (7) any strike of workmanship, any act of god, unavoidable accidents, inability to secure materials or to use materials in the performance of the work by reason of laws or regulations of the united states of america or the state of (state) , or any other (8) beyond their control, other than the want of funds. no such delay shall be deemed a default on the part of the contractors, and, in the event of any such delay, the contractor's time limit for performance of the work shall be correspondingly extended. workmen's compensation and public liability insurance on the above work shall be (9) by the contractor. this contract shall be deemed null and void if not signed within thirty days. yours (10) accepted; by mr smith date 7/12/2010 варианты ответов: 1.sincerely 2. propose 3. completion 4. approval 5. in writing 6. extra charge 7. liable 8. on account of 9. circumstance 10.provided

199
277
Посмотреть ответы 2

Ответы на вопрос:


  contract proposal for services,

dear mr black,we hereby  propose  to furnish all materials and perform all labor necessary for the  completion  of davit installation of the following specifications: one no. 1000 lb. galvanized davit installed on seawall four-way lifting bridlethree 2"x8" wood fenders anchored to the wall with 5' rubber bumper strip on each.this work is to be performed on lot. blk. sub. for (name of owner), owner, in accordance with the drawings and specifications submitted for the above work. the total cost including state tax is (amount)payments to be made as follows : the sum of (amount) to be paid upon the  approval  of this contract and the balance of (amount) upon the completion of the work.

any alteration or deviation from the above specifications involving extra cost of material or labor will only be executed upon written orders for same and will become an  extra charge  over the sum mentioned in this contract.all agreements must be made  in writing.property lines shall be designated by substantial marks, by owner or his certified engineer. the contractors shall not be   liable, as regards to the completion of the work, for any delay which may be caused by reason or   provided  any strike of workmanship, any act of god, unavoidable accidents, inability to secure materials or to use materials in the performance of the work by reason of laws or regulations of the united states of america or the state of (state) , or any other   circumstance  beyond their control, other than the want of funds. no such delay shall be deemed a default on the part of the contractors, and, in the event of any such delay, the contractor's time limit for performance of the work shall be correspondingly extended.workmen's compensation and public liability insurance on the above work shall be  on account of  by the contractor.this contract shall be deemed null and void if not signed within thirty days.yours   sincerely


in the united kingdom with education is compulsory for children from 15 to 16 years. all state schools in britain government. at the age of 5 years old children go to a prep school, which is the first stage of primary education. from 7 to 11 years old pupils attend elementary school which is the second stage of primary education. at the age of 11 most pupils go to secondary school, the so-called unified school. this school takes children of all abilities without entrance examinations.

Реши свою проблему, спроси otvet5GPT

  • Быстро
    Мгновенный ответ на твой вопрос
  • Точно
    Бот обладает знаниями во всех сферах
  • Бесплатно
    Задай вопрос и получи ответ бесплатно

Популярно: Английский язык

Caktus Image

Есть вопросы?

  • Как otvet5GPT работает?

    otvet5GPT использует большую языковую модель вместе с базой данных GPT для обеспечения высококачественных образовательных результатов. otvet5GPT действует как доступный академический ресурс вне класса.
  • Сколько это стоит?

    Проект находиться на стадии тестирования и все услуги бесплатны.
  • Могу ли я использовать otvet5GPT в школе?

    Конечно! Нейросеть может помочь вам делать конспекты лекций, придумывать идеи в классе и многое другое!
  • В чем отличия от ChatGPT?

    otvet5GPT черпает академические источники из собственной базы данных и предназначен специально для студентов. otvet5GPT также адаптируется к вашему стилю письма, предоставляя ряд образовательных инструментов, предназначенных для улучшения обучения.

Подпишись на наш телеграмм канал

GTP TOP NEWS